Back to Website Back to Gallery
Back to House Building First Prev 1 of 0 Next Last
Back to House Building First Prev 1 of 0 Next Last

December 16
The pink batts were left out of the bottom of the walls to let the timber framing dry out. Moisture needs to be 18% or less and it is now 22%. It was 40% last week.
Photographs Copyright Arnold Acres Design.